This project involves implementation of sub base and base and asphalt pavement of Persian Gulf freeway with a length of more than 50 Kilometers on each side, total 100 Kilometers. This freeway was executed in 5 Sections, which 2 parts of pavement cost almost 180 billion rials (4.5 million dollars).