The above projects have been pilot and experimental to achieve the features and benefits of emulsion bitumen instead of bitumen solution. Some of the benefits include:
Maximum environmental compatibility compared to hot asphalt
Ease of repair of asphalt which is damaged in subsequent excavations.
Possibility of maintaining cold production of asphalt for up to 7 days at 20 ° C and carrying up to long distances
Creating a very tight surface finish texture with low porosity